Vecoplan Midwest Introduces the CPP

posted in: Uncategorized | 0

The CPP  – Containerized Pellet Plant

CPP is the quick, easy and affordable solution for 1 to 2 ton per hour pellet production.  A turnkey pellet production plant housed in standard shipping containers, the CPP is designed, built and shipped from Vecoplan Midwest’s New Albany, IN location. It comes complete with controls, and arrives on 2 semi trucks. All you provide is a flat 40’ surface and electric feed to the main panel. A crane is used to stack the containers and the CPP can be up and running production within 4 hours.

The CCP easily adapts to most existing trailer load out systems, alleviates the need for expensive buildings and is the perfect for processing, wood, biomass, feed products, manures, most anything that needs to be pelleted. The plant can be relocated in a very short time should the need arise. Vecoplan Midwest stands ready to provide after sales service and parts as well as on site operator training.

For more information contact Vecoplan Midwest at: Phone: 812-923-4992, Email:  HYPERLINK “mailto:bmiller@vecoplanmidwest.com” bmiller@vecoplanmidwest.com or visit our website at  HYPERLINK “http://www.veVecoplanmidwest.com” www.vecoplanmidwest.com